Contribute  :  Advanced Search  :  Site Statistics  :  Directory  :  Links  :  Polls  :  Calendar  
www.attackbuild.com Building a K1 Attack
Welcome to www.attackbuild.com
Wednesday, September 08 2010 @ 08:28 PM EDT
 Boat Repair 
Boat completely gutted after a good pressure washing.
[800x600] [3072x2304]
Boat completely gutted after a good pressure washing.
Viewed: 125 times.

Setting the level line for the rear frame.
[800x600] [3072x2304]
Setting the level line for the rear frame.
Viewed: 118 times.

The rig.
[800x600] [3072x2304]
The rig.
Viewed: 131 times.

Ooops... by the time i got the angle right I was a little short.
[800x600] [3072x2304]
Ooops... by the time i got the angle right I was a little short.
Viewed: 120 times.

Dry fitting the rear frame and stringers.
[800x600] [3072x2304]
Dry fitting the rear frame and stringers.
Viewed: 116 times.

Dry fitting the rear frame and stringers.
[600x800] [2304x3072]
Dry fitting the rear frame and stringers.
Viewed: 155 times.

Duplicating the old front stringers.
[800x600] [3072x2304]
Duplicating the old front stringers.
Viewed: 126 times.

New front stringers.
[800x600] [3072x2304]
New front stringers.
Viewed: 129 times.

Tranferring carboard template of the rear deck section to plywood.
[800x600] [3072x2304]
Tranferring carboard template of the rear deck section to plywood.
Viewed: 118 times.

Test fitting the reat deck section.
[600x800] [2304x3072]
Test fitting the reat deck section.
Viewed: 116 times.

Test fitting the deck side sections with the frame and stringers.
[800x600] [3072x2304]
Test fitting the deck side sections with the frame and stringers.
Viewed: 132 times.

Tranferring old front center section to new wood..
[800x600] [3072x2304]
Tranferring old front center section to new wood..
Viewed: 119 times.

Test fitting front center section.
[800x600] [3072x2304]
Test fitting front center section.
Viewed: 139 times.

Assembling the frame.
[800x600] [3072x2304]
Assembling the frame.
Viewed: 120 times.

Letting the CPES dry.
[800x600] [3072x2304]
Letting the CPES dry.
Viewed: 145 times.

Final hull prep.
[600x800] [2304x3072]
Final hull prep.
Viewed: 125 times.

Powered by Gallery v1 RSS